IMG_9224
IMG_9226
IMG_9223
IMG_9222
IMG_9231
IMG_9229
IMG_9235
IMG_9247
IMG_9255
IMG_9227
IMG_9221
IMG_9220
previous arrow
next arrow
IMG_9224
IMG_9226
IMG_9223
IMG_9222
IMG_9231
IMG_9229
IMG_9235
IMG_9247
IMG_9255
IMG_9227
IMG_9221
IMG_9220
previous arrow
next arrow

Maverick Center

Salt Lake City, Utah

Year Completed: 2019

Scope: The Engineering team at Louis A. Roser Company was asked to evaluate the equipment at Maverik center and offer suggestions to run more efficiently and prolong the life of the facility, both with and without the ice floor in place. 

 

Our design was approved, and we worked with Lewis Young Robertson and Lux Energy to remove some of the aging equipment and install: 

  • A new Ammonia Compressor with a Variable Frequency Drive (VFD) 
  • New Evaporative Condenser and Cooling Towers 
  • Ammonia to Brine HX for the ice floor 
  • New Brine Pumps and associated piping 
  • Ammonia to Glycol HX for arena comfort cooling 

 

The retrofit went well, it works wonderfully, and looks amazing.  Best of all, the soft ice issues are resolved, and they have reduced electrical costs.  

ready to work with us?